Coomera, QLD | 2019-2020

Westfield Coomera – Civil Infrastructure

This project included bulk earthworks, detailed excavation, erosion and sediment controls, culvert installation, and stormwater and pavement construction to enable the building contractor to construct the new Westfield Coomera.

Westfield Coomera – Civil Infrastructure
About

Our project team held key roles in the management team responsible for the delivery of the civil scope for Westfield Coomera. The civil scope included one of the largest metro-based earthworks operations at the time in the Gold Coast region.

Works included bulk earthworks, detailed excavation, erosion and sediment controls, culvert installation, and stormwater and pavement construction. More specifically some of the project highlights have included:

  • Over 2km’s in stormwater pipework installed,

  • Export of 75,000m3 of topsoil material offsite,

  • Approximately  240,000m3 of earthworks operations,

  • Supply and install of 55,000 tonnes of capping material,

  • Sewer connection underbores

  • Supply and laying of over 15,000 tonnes of road base material

  • Laying of over 4 km of concrete kerb and channel

  • Supply and installation of over 6000m2 of concrete loading docks

  • Supply and laying of over 30,000 tonnes of asphalt.

  • Sector

    Earthworks, Civil Infrastructure, Project Management

  • Client

    Scentre Group

  • Location

    Coomera, QLD

  • Year

    2019-2020